Company: Link Technologies
Case No: L09135. Project: 09.40: LinkSOFT Version 9.4
Logged By: Aarti Pooja Gayaneshwar (Link Business Solutions) on 25 Feb 2018 07:22PM
Priority: High
Product: Payroll & HR
Group: Software Defect
Time Taken: 9.00 (Weight: 9.00)
Version: 9.496.1128
Assigned To: Sanjay (Link Technologies)
Circulation: Aarti Pooja Gayaneshwar, Alvis, Development, Rashna, Sanjay
Resolve By: Monday, 26 February 2018 12:00 AM [2250 days since logged date]
Status: Closed
Subject: GL file is not generating in demo database
Summary:    

Dear Sanjay,

Testing of the csv file has been performed in the demo database but the system did not output the file.

Refer to steps below: 

  1. Created demo database in version 9.2.5.0.000
  2. Configured the following in ESS:
    • Activated: GLJournalFile
    • Enabled processes: ESS026 & SYS009
  3. Created MTM pay in Linksoft
  4. Updated Pay
  5. csv file did not output
Note: The pay was created at 11.42am, even after waiting for more than 6 hours, the status is still sitting on "READY". This was working fine in BETA 9.2.4.0.000.

Environment Details:

  1. QA: 4
  2. DB: LINKSOFT
  3. V: 9.2.5.0.000

Refer to image below:

Figure 1: GL Setup




Figure 2: FMIS Integration 



Figure 3: GL Journal View






Audit Notes:
26 Feb 201808:07AM Comment 1 by Alvis (Link Technologies) Case 9135 added to project 9.2
26 Feb 201808:38AM Comment 2 by Sanjay (Link Technologies) Assigned To: Aarti Pooja Gayaneshwar (Link Business Solutions) Followup Date: 26-02-2018 08:38 AM Time Taken: 1.00

Hi Aarti,

I have verified this and the file is created in my environment. Can you re-install your applications and try again.

regards
Alvis


26 Feb 201809:45AM Comment 3 by Aarti Pooja Gayaneshwar (Link Business Solutions) Assigned To: Alvis (Link Technologies) Followup Date: 27-02-2018 12:00 AM Time Taken: 2.00

Hi Alvis,

I have performed the following:

  1. Uninstalled Linksoft and LinkWeb
  2. Deleted the Link Technologies folder
  3. Installed Linksoft and LinkWeb
  4. Created a demo database in QA4
  5. Configured ESS:
    1. Activated: GLJournalFile
    2. Enabled processes: ESS026 & SYS009
  6. Created MTM pay in Linksoft
  7. Updated Pay
  8. csv file did not output


The status is still sitting on “READY”. Requesting if we can do GTM to take a look.


Environment Details:

  1. Application: QA3
  2. DB: LINKSOFT 
  3. DB Setup: QA4
  4. V - 9.2.5.0.000




26 Feb 201811:08AM Comment 4 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 26-02-2018 11:08 AM Time Taken: 2.00

Hi Sanjay, 

As per the GTM session with Alvis, 

The GL Journal View is not completed for an updated pay, when the "EnableIntegrationScheduler" and "EnableReportEmailScheduler" are both enabled.

In addition, the system gives an error in the event log. Refer to Figure 1.

Setup

Database - LINKSOFT ON QA4
Application hosted on QA3.
Version 9.2.5.

Figure 1: Error in Event Log



26 Feb 201802:05PM Comment 5 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 26-02-2018 02:05 PM Time Taken: 2.00

The issue was caused by the new licencing constraints. I have removed this for this version due to release urgency.

The update will be in 926


27 Feb 201810:22AM Comment 6 by Alvis (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 27-02-2018 10:22 AM Time Taken: 1.00
System tests completed. Ready for UAT. 

27 Feb 201801:44PM Comment 7 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 27-02-2018 01:44 PM
Hi Rashna, please proceed with UAT using 9.2.6 (Beta 6) 

27 Feb 201804:23PM Comment 8 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 28-02-2018 12:00 AM Time Taken: 1.00
Hi Sanjay, 

Please review and close the case.

Thanks Rashna.

QA Results
Step 1 - Developer will perform test based on test cases provided
Step 2 - Product expert to complete Product QA based on test cases.

Test cases are provided on the case header before the case is approved for development.

Test Results Summary

Table 1 - Summarised list of issues
oTest Description Pass/Fail 
1
Enable GLJournalFile. This should be executed without errors
 
Pass
2
Create and update pay run ID - 437 Pass
3
FMIS Integration should be completed without errors
 
Pass
4
GL Journal View should be completed without errors 
Pass
5
GL output file should be available under attachments Pass
6Users should be able to view attachment, this downloads the file Pass

QA Environment Details

  1. OS version:Windows 7
  2. Application version: 9.2.6
  3. Database (Demo/New/Client): Demo - LINKSOFT on QA1

Steps to reproduce failed scenarios:

Figure 1: GL Attachments



    27 Feb 201804:50PM Comment 9 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 27-02-2018 04:50 PM
    Thank you Rashna Priya Lingam.

    09 Oct 201908:14AM Comment 10 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019
    If you have any queries regarding this support incident, please email admin@linktechnologies.com.au and include the Case No: L09135 in the subject line of all emails regarding this issue.

    Document size: 12.9 KB
    For call complaints, please contact the Managing Director of the company using this form