Subject: | Incorrect leave dates assigned to new employees. |
Summary: | Hi Sanjay, When assigning leaves to a new employees, the system reflect incorrect leave dates. Testing Information:
- V818
- Linksoft demo database
- QA1
Steps to replicate:
- The HRM to Payroll integration is set to “N”
- Created a new employee as “E069”
- Start Date: 01/01/2017
- Pay Team: Weekly
- Assigned leave “AAL”, the leave date is: 01/01/2017 – 31/12/2014
- The leave code “AAL” is set as Calendar.
The leaves dates appear incorrectly on the menu 328-2. Refer image below:
|
Audit Notes: | |
27 Oct 2017 | 07:49AM Comment 1 by Alvis (Link Technologies) Case 8882 added to project 8.19 |
27 Oct 2017 | 08:52AM Comment 2 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 27-10-2017 08:52 AM Time Taken: 1.00 |
| Corrected issue with Leave dates. Update will be in 8.18.001 and 8.19. |
|
15 Nov 2017 | 01:20PM Comment 3 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 15-11-2017 01:20 PM Time Taken: 1.00 |
| Tested case in QA1 with database LINKSOFT. Tested with version 819.Beta 1 Table 1 - Summarised list of issues No | Issue Description | Resolved? | 1 | Created AAL20 with Rollover Method as Calendar. Allocated leave to employee on the allocation screen, leave dates should be reflected correctly | Pass | 2 | Allocated AAL20 from mass leave generation menu 316-2, leave dates should be reflected correctly | Pass | 3 | Created ASL15 with Rollover Method as Anniversary. Allocated leave to employee on the allocation screen, leave dates should be reflected correctly | Pass | 4 | Allocated ASL15 from mass leave generation menu 316-2, leave dates should be reflected correctly | Pass |
Figure 1: Leave Allocation
|
|
09 Oct 2019 | 08:14AM Comment 4 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019 |