Company: Link Technologies
Case No: L08739. Project: 08.20: LinkSOFT Version 8.2
Logged By: Rashna (Edge Business Solutions) on 09 Aug 2017 10:23AM
Priority: High
Product: Payroll & HR
Group: Change Request
Time Taken: 7.00 (Weight: 7.00)
Version: 8.290.0115
Assigned To: Sanjay (Link Technologies)
Circulation: Alvis, Rashna
Resolve By: Thursday, 10 August 2017 12:00 AM [2452 days since logged date]
Status: Closed
Subject: Revised format for PAYE Electronic file
Summary:    

Hi Team, 

FRCA emailed the revised PAYE electronic format. The line totals have been increased to 250.

Please find attached the PAYE File Format Specification. Attached also is a sample file

Test Plan

 Test Number 1 Description  Results 
 1The EMS file should be correctly generated for month. 
 2The consolidated EMS file should also be successfully generated 
 3The file contents should be as per the attached file format 

Audit Notes:
09 Aug 201702:45PM Comment 1 by Alvis (Link Technologies) Case 8739 added to project 8.17
10 Aug 201702:51PM Comment 2 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 10-08-2017 02:51 PM Time Taken: 1.00
Development work for this case has been completed.
The change will be available in version: 8.17
Documentation update required(Yes/No. Add change details below): No
QA required(Yes/No.Include areas that require testing): Yes

1. The following changes were made(Include Database object names, Program classes and any other relevant information):|

  1. Changed the electronic output file as per specifications provided.

17 Aug 201709:30AM Comment 3 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 17-08-2017 09:30 AM
Individual patch is available for download from ftp. File name: "8.16.000_CASE8739_PAYEElectronicFile.zip"

17 Aug 201701:26PM Comment 4 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 17-08-2017 01:26 PM Time Taken: 3.00
QA for product and Patch Releases
Step 1 - Developer to system test changes until not issues are found - Alvis and Sanjay to sign off on System Test
Step 2 - Product expert allocated by Consulting Manager for Product QA.
               Consulting Manager to allocate resource
               Consulting Manager to sign off on UAT and Generic Test

STEP 1 - DETAILS OF QA can be entered in case comments. Summary to be maintained in the table below.

Case tested in QA1 with database LINKSOFT

Table 1 - Summarised list of issues
NoIssue Description Resolved? 
1 The EMS file should be correctly generated for month Pass
2 The consolidated EMS file should also be successfully generated  Pass
3 The file contents should be as per the attached file format 

 Failed

  1. The filler count for the details is 123, this should be 122. Refer to item number 16 in the specification.
  2. "Environment and Climate Adaptation Levy" amount  is currently displayed under "Redundancy" in the details. Refer to figures below. 
  3. "Environment and Climate Adaptation Levy" amount  is currently displayed under "Redundancy" in the footer. Refer to figures below.

Figure 1: ECAL amount is $14.50

Figure 2: Output on the file. Environment and Climate Adaptation Levy should be the amount before the filler. Refer to item 15 under the detail in the specification



WORKFLOW:

  1. Original case assigned to Development
  2. When the product is ready for release, System test details are entered into comments and the CASE HEADER Table updated.
  3. If system test passes, assign case to Consulting Manager for UAT
  4. If UAT Passes, Assign case for Documentation or close case

    17 Aug 201702:05PM Comment 5 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 17-08-2017 02:05 PM Time Taken: 1.00

    Hi Rashna,

    I have corrected the file format. Please download and apply the patch again.

    regards
    Alvis


    17 Aug 201703:07PM Comment 6 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 17-08-2017 03:07 PM Time Taken: 2.00
    QA for product and Patch Releases
    Step 1 - Developer to system test changes until not issues are found - Alvis and Sanjay to sign off on System Test
    Step 2 - Product expert allocated by Consulting Manager for Product QA.
                   Consulting Manager to allocate resource
                   Consulting Manager to sign off on UAT and Generic Test

    STEP 1 - DETAILS OF QA can be entered in case comments. Summary to be maintained in the table below.

    Case tested in QA1 with database LINKSOFT

    Table 1 - Summarised list of issues
    NoIssue Description Resolved? 
    1

    The filler count for the details is 123, this should be 122. Refer to item number 16 in the specification.

    Pass
    2"Environment and Climate Adaptation Levy" amount  is currently displayed under "Redundancy" in the details. Refer to figures below.
    Pass
    3 "Environment and Climate Adaptation Levy" amount  is currently displayed under "Redundancy" in the footer. Refer to figures below.  Pass

    WORKFLOW:

    1. Original case assigned to Development
    2. When the product is ready for release, System test details are entered into comments and the CASE HEADER Table updated.
    3. If system test passes, assign case to Consulting Manager for UAT
    4. If UAT Passes, Assign case for Documentation or close case

      09 Oct 201908:14AM Comment 7 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019
      Attachments:
      General Documents - Case: 8739:FRCS-Payroll-Speification-v5.01 (00000003).pdf
      If you have any queries regarding this support incident, please email admin@linktechnologies.com.au and include the Case No: L08739 in the subject line of all emails regarding this issue.

      Document size: 13.7 KB
      For call complaints, please contact the Managing Director of the company using this form