Subject: | VMS requirements from FRCA for POS certification [Created from case 8794] - ESDC offline |
Summary: | ESDC - offline processing Waiting for hardware device to be shipped to Sydney. Contact Details: Ivan Pavlovic Product Manager phone +381 (63) 8675501
|
Audit Notes: | |
16 Oct 2017 | 03:42PM Comment 1 by Alvis (Link Technologies) Created from case 8794 |
16 Oct 2017 | 03:44PM Comment 2 by Alvis (Link Technologies) Case 8876 added to project 8.19 |
20 Oct 2017 | 09:25AM Comment 3 by Sanjeet (Link Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 20-10-2017 09:25 AM Time Taken: 0.50 |
| Hi Sanjay, The device has been shipped to you on last Wednesday. Regards Sanjeet |
|
03 Nov 2017 | 10:30AM Comment 4 by Sanjeet (Link Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 03-11-2017 10:30 AM Time Taken: 0.50 |
| Bula Team, FRCS has confirmed that the physical device may change but the protocol to communicate with the device will not change. Response from FRCS as below +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Bula Sanjeet, No changes will be required on POS side. Reason those ESDC devices will not be used in production is that DTI do not plan to enter POS or ESDC market. Those devices does not have production quality (casing etc). We have used those devices for development, testing and proof of concept only. It also helped us wrote clear specification for E-SDC developers. Please check latest version of Technical Instructions for POS Developers published on FRCS web site http://www.frcs.org.fj/vat-monitoring-system-vms/ Regards, Ivan +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Also agreed to have the configuration at DB level to allow for "VMS Integration" which only Link will have access to. Regards Sanjeet |
|
09 Nov 2017 | 02:31PM Comment 5 by Alvis (Link Technologies) Case 8876 removed from project 8.19 |
09 Nov 2017 | 02:32PM Comment 6 by Alvis (Link Technologies) Case 8876 added to project 8.19B |
04 Dec 2017 | 10:15AM Comment 7 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 04-12-2017 10:15 AM Time Taken: 40.00 |
| Development work for ESDC integration has been completed. Notes: - Settings for ESDC are shown in Figure 1 below.
- The API URL should not have the "/" at the end.
- ESDC is a database level setting.
- IF VSDC is enabled and ESDC is enabled, VSDC will take preference
This update will be available on 8.2 for testing. Figure 1 - ESDC Configuration
|
|
08 Dec 2017 | 03:34PM Comment 8 by Sanjeet (Link Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 08-12-2017 03:34 PM Time Taken: 2.00 |
| QA for product and Patch Releases Step 1 - Developer to system test changes until not issues are found Step 2 - Product expert to complete Product QA. Test Summary - Setup ESDC Device
- Configure ESDC on POS
- Perform Cash Sale. Message as in figure 1 below
- Green Light is stable on ESDC Device
The Message is only displayed on the 1st attempt. The user has to log out of POS after green light is stable and sale thereafter is flawless.
Figure 1.
|
|
08 Dec 2017 | 05:13PM Comment 9 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 08-12-2017 05:13 PM Time Taken: 1.00 |
| Hi Sanjeet, I will close this case as the initial testing has completed and we are looking at specific issues. This issue is also reported in case 8960 |
|
16 Jan 2018 | 03:14PM Comment 10 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 16-01-2018 03:14 PM Time Taken: 1.00 |
| Hi Sanjeet, The issue is with the current ESDC. I can add further delays in the processing, however, when we build our own ESDC these issues won't be present. Can you test this on the ESDC update Ivan said he has? |
|
22 Jan 2018 | 01:29PM Comment 11 by Sanjeet (Link Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 23-01-2018 12:00 AM Time Taken: 0.50 |
| Hi Sanjay, After the upgrade at Lami Chemist , client still get "The remote server returned an error.(400) bad request". This happens on the very 1st sale cashier does from POS. Can we check ESDC status on login as opposed to "Complete Sale"? Regards Sanjeet
|
|
25 Jan 2018 | 04:24PM Comment 12 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 25-01-2018 04:24 PM Time Taken: 2.00 |
| Hi Sanjeet, I checked this on the physical device and this happens intermittently. On the VPN ESDC environment, this does not happen. It seems like the issue is specific to the PI ESDC. Since Ivan has confirmed this is not to be used in Live environments, can you switch Lami Chemist over to use VSDC? Maybe we should discuss this again with a conference call with Ivan on Monday as I am not sure how we can consistently reproduce this. Can you arrange , his please? Regards Sanjay |
|
06 Feb 2018 | 09:20AM Comment 13 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 06-02-2018 09:20 AM |
| PI ESDC is replaced with VPN ESDC. This case is replaced with Case 9066 in version 8.3 |
|
09 Oct 2019 | 08:14AM Comment 14 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019 |