1. Was this test completed using Demo / New / Other database? Demo 2. Did the test pass or fail? Pass 3. Tab order, spelling, alignment, font size consistency, screen size etc checked? N/A 4. Data verified, saved, edit, delete/void? N/A 5. Documentation update required? No
Additional Details (Risks, issues, special conditions required for this test to pass etc): Test Plan Task No | Task Description | Status | 1 | Processed a CSV file from 8am to 5pm for E001. This is a valid entry | Pass | 2 | Processed a csv frime from 8am to 5pm fro E003. There was a break at 11am. This is a valid entry | Pass | 3 | Generate the Timesheet Log Report. Entries in 1 and 2 should be popluated | Pass | 4 | Generate the Timesheet Log Report with filters absentees and incomplete entries. Entries in 1 and 2 should NOT be popluated | Pass |
Timesheet Report Timesheet with Incomplete Entry
|