Subject: | Leave details disappear under "Leave Applications" when the user logs out and logs back into the system to edit the entry. |
Summary: |
1. Explain the issue Leave details disappear under "Leave Applications" when the user logs out and logs back into the system to edit the entry. 2. Steps to reproduce - Change the shift for user admin as DS.
- Create a leave entry for dates 01/08/2018 to 10/08/2018. Leave Time from 8am to 5pm.
- Save the leave entry.
- Log out of the system.
- Log back in the system.
- Navigate to "Leave Application" and click on "Edit" for the leave transaction created in 3 above.
3. Environment Details - Version 9.5 Alpha 1
- Database - LINKSOFT-UAT95-LINKFJ on QA4
- Tested with Google Chrome - Version 68.0.3440.106 and IE - Version 11.0.9600.19036
4. Screenshot: Include screenshots for cases that need clarity. Reduce the image size before attaching it to the case. Figure 1: Leave Alert for Transaction HRL000097
Figure 2: Editing Transaction HRL000097
|
Audit Notes: | Edited by alvis on 05/10/18 11:39. |
15 Aug 2018 | 02:15PM Comment 1 by Alvis (Link Technologies) Case 9505 added to project 09.5 |
21 Aug 2018 | 07:56AM Comment 2 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 21-08-2018 07:56 AM Time Taken: 3.00 Notes: Edited by sanjay on 21/08/18 08:00. |
| Development work for this case has been completed. The change will be available in version: 95 1. The following changes were made(Include Database object names, Program classes and any other relevant information):| - Corrected load controls function to get the shift details for new/existing entries
2. The issue was caused by: - Incorrect function code
3. Next Step - UAT
|
|
23 Aug 2018 | 07:36AM Comment 3 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 23-08-2018 07:36 AM |
| Proceed with UAT using LinkSOFT95BETA2 |
|
23 Aug 2018 | 10:19AM Comment 4 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 23-08-2018 10:19 AM Time Taken: 1.00 |
| Hi Sanjay QA Results Tests carried out according to requirements specified on the case header Test Results Summary Table 1 - Summarised list of issues No | Test Description | Pass/Fail | 1 | Create a leave application for admin - 1001-HRL000097. Log out, Log in the system and edit the leave under "Leave Application". Details should appear. | Pass | 2 | Create a leave application for admin - 1001-HRL000098.Edit the leave under "Leave Application". Details should appear. | Pass |
Environment Details - OS version:Windows Server 2012
- Application version:9.5 Beta 2
- Setup: Demo
- Server : QA4
- Database:LINKSOFT-UAT95-LINKFJ
Steps to reproduce failed scenarios: - N/A
Next Step: Case assigned Sanjay for closure.
|
|
23 Aug 2018 | 02:59PM Comment 5 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 23-08-2018 02:59 PM |
| Thanks Rashna |
|
09 Oct 2019 | 08:14AM Comment 6 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019 |