Subject: | Incorrect report is emailed from Report scheduler when the user switches to a different company |
Summary: | Incorrect report is emailed from Report scheduler when user switches to a different company. For example: - User logs to company 1001 and schedules a project status report
- User switches to company 1002 then logs out of the application.
- When the report scheduler sent the report scheduled in 1. above, the company was 1002 and the report data was blank.
|
Audit Notes: | Edited by sanjay on 11/09/19 13:43. Edited by sanjay on 28/02/19 14:54. |
15 Nov 2018 | 03:43PM Comment 1 by Alvis (Link Technologies) Case 9708 added to project 10.2 |
08 Mar 2019 | 08:29AM Comment 2 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 08-03-2019 08:29 AM Time Taken: 10.50 |
| Development work for this case has been completed. The change will be available in version: 11.0.0301 1. The following changes were made(Include Database object names, Program classes and any other relevant information):| - Added CompanyID to the Report Schedule so the Reports can use this when automatically generated
2. The issue was caused by: - CompanyID was not part of the Report Generation Framework.
3. Next Step: - UAT
|
|
11 Mar 2019 | 02:39PM Comment 3 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 12-03-2019 12:00 AM Time Taken: 2.50 |
| Hi Sanjay QA Results Tests carried out according to requirements specified on the case header Test Results Summary Table 1 - Summarised list of issues No | Test Description | Pass/Fail | 1 | - Schedule the "Asset Listing" report in company 1001.
- Switch company and go into company 1002.
- Log out of the system.
- Login and verify that the email is created in company 1001, the report has details from company 1001 and the email is sent without errors.
| Pass | 2 | - Schedule the "Asset Listing" report in company 1001.
- Switch company and go into company 1002.
- Wait for 5 minutes
- Go back to company 1001 and verify that the email is created in company 1001, the report has details from company 1001 and the email is sent without errors.
| Pass |
Environment Details - OS version: Windows Server 2012
- Application version: 11.0.308
- Setup: Demo
- Server : 10.0.0.14
- Database: LINKSOFT_REPORTNOTES
Steps to reproduce failed scenarios: N/A Next Step: for closure
|
|
13 Mar 2019 | 09:25AM Comment 4 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 13-03-2019 09:25 AM Time Taken: 1.50 |
| Thanks Rashna |
|
09 Oct 2019 | 08:14AM Comment 5 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019 |