Subject: | Improvements to station base configuration change |
Summary: | Improvements to station base configuration change. - Add a checkbox on edit form to "Update all stations"
- Convert update to a SQL procedure
- Add a detail grid to show values from all stations.
|
Audit Notes: | |
25 Aug 2017 | 11:24AM Comment 1 by Alvis (Link Technologies) Case 8780 added to project 8.18 |
01 Sep 2017 | 04:07PM Comment 2 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 01-09-2017 04:07 PM Time Taken: 8.00 |
| The following changes have been made: - Add a checkbox on edit form to "Update all stations"
- Convert update to a SQL procedure
- Add a detail grid to show values from all stations.
- Added editor to handle data type
Regards Sanjay |
|
01 Sep 2017 | 05:00PM Comment 3 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 01-09-2017 05:00 PM Time Taken: 4.00 |
| Added ability to edit Station layout using editor with data type based controls. |
|
21 Sep 2017 | 03:27PM Comment 4 by Vineshwar Prasad (Edge Business Solutions) Assigned To: Rashna (Edge Business Solutions) Followup Date: 21-09-2017 12:00 AM Time Taken: 1.00 |
| QA for product and Patch Releases Step 1 - Developer to system test changes until not issues are found - Alvis and Sanjay to sign off on System Test Step 2 - Product expert allocated by Consulting Manager for Product QA. Consulting Manager to allocate resource Consulting Manager to sign off on UAT and Generic Test
STEP 1 - DETAILS OF QA can be entered in case comments. Summary to be maintained in the table below. Table 1 - Summarised list of issues No | Issue Description | Resolved? | 1 | Change details from POSWEB (QA1) to be effective at LINKQA1 | Pass | 2 | Change details from POSWEB (QA1) to be effective at LINKQA3 | Pass | 3 | Change details from POS Application (LINKQA1) to be effective at POSWEB (QA1) | Pass | 4 | Change details from POS Application (LINKQA3) to be effective at POSWEB (QA1) | Pass |
WORKFLOW: - Original case assigned to Development
- When the product is ready for release, System test details are entered into comments and the CASE HEADER Table updated.
- If system test passes, assign case to Consulting Manager for UAT
- If UAT Passes, Assign case for Documentation or close case
|
|
27 Sep 2017 | 01:07PM Comment 5 by Rashna (Edge Business Solutions) Assigned To: Rashna (Edge Business Solutions) Followup Date: 27-09-2017 01:07 PM Time Taken: 2.00 |
| Hi Alvis, The option to update values for all stations is not included in 818 Beta 1. This is available under in the development link. In addition, there is an incorrect spelling of station in Dev-POS.. Refer to Figure. Figure 1: Update all stations Rashna |
|
27 Sep 2017 | 01:09PM Comment 6 by Rashna (Edge Business Solutions) Assigned To: Alvis (Link Technologies) Followup Date: 27-09-2017 01:09 PM |
| Hi Alvis, The option to update values for all stations is not included in 818 Beta 1. This is available under in the development link. In addition, there is an incorrect spelling of station in Dev-POS.. Refer to Figure. Figure 1: Update all stations Rashna |
|
|
27 Sep 2017 | 04:13PM Comment 7 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 27-09-2017 04:13 PM Time Taken: 1.00 |
| Resolved issue in beta2. |
|
28 Sep 2017 | 10:57AM Comment 8 by Vineshwar Prasad (Edge Business Solutions) Assigned To: Rashna (Edge Business Solutions) Followup Date: 28-09-2017 12:00 AM Time Taken: 1.00 |
| QA for product and Patch Releases Step 1 - Developer to system test changes until not issues are found - Alvis and Sanjay to sign off on System Test Step 2 - Product expert allocated by Consulting Manager for Product QA. Consulting Manager to allocate resource Consulting Manager to sign off on UAT and Generic Test
STEP 1 - DETAILS OF QA can be entered in case comments. Summary to be maintained in the table below. Table 1 - Summarised list of issues No | Issue Description | Resolved? | 1 | Update All Stations successfully | Pass |
WORKFLOW: - Original case assigned to Development
- When the product is ready for release, System test details are entered into comments and the CASE HEADER Table updated.
- If system test passes, assign case to Consulting Manager for UAT
- If UAT Passes, Assign case for Documentation or close case
|
|
02 Oct 2017 | 09:26AM Comment 9 by Rashna (Edge Business Solutions) Assigned To: Rashna (Edge Business Solutions) Followup Date: 02-10-2017 09:26 AM Time Taken: 1.00 |
| Documentation Completed. Documentation updated under Point of Sale WEB - Point of Sale -- Station Base Configuration. |
|
09 Oct 2019 | 08:14AM Comment 10 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019 |