Company: Link Technologies
Case No: L09358. Project: 10.10: LinkSOFT Version 10.1
Logged By: Alvis (Link Technologies) on 21 Jun 2018 09:25AM
Priority: High
Product: Payroll & HR
Group: Enhancement
Time Taken: 3.00 (Weight: 3.00)
Version: 10.155.0117
Assigned To: Sanjay (Link Technologies)
Circulation: Alvis, Development, Rashna, Sanjay
Resolve By: Friday, 29 June 2018 12:00 AM [2108 days since logged date]
Status: Closed
Subject: Time entry - null exception when customer, activity, project is not configured
Summary:    

During the AYW upgrade, null exception was shown in error log, this was caused by Time entry - null exception when customer, activity, project is not configured.

Audit Notes:Edited by sanjay on 08/12/20 09:48. Edited by sanjay on 26/11/19 08:09. Edited by sanjay on 05/03/19 09:17. 
21 Jun 201809:25AM Comment 1 by Alvis (Link Technologies) Case 9358 added to project 09.5
21 Aug 201804:48PM Comment 2 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 21-08-2018 04:48 PM Time Taken: 2.00
Development work for this case has been completed.
The change will be available in version: 9.5

1. The following changes were made(Include Database object names, Program classes and any other relevant information):|

  1. Added null checks on dropdowns

2. The issue was caused by:

  1. Nulls in dropdowns

    3. Next Step

    1. UAT

    23 Aug 201807:58AM Comment 3 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 23-08-2018 07:58 AM
    Proceed with UAT using LinkSOFT95BETA2

    27 Aug 201810:47AM Comment 4 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 27-08-2018 10:47 AM Time Taken: 1.00
    Hi Sanjay
    QA Results
    Tests carried out according to requirements specified on the case header

    Test Results Summary

    Table 1 - Summarised list of issues
    NoTest Description Pass/Fail 
    1
     Create a Customer is "John Limited",Project as "Linksoft" and  Activity as "UAT" 
    Pass
    2In the demo database, removed the activity from the system. "Object reference error should not occur"Pass
    3If a company, project, and activity is created and not mapped to it should not appear in the dropdownPass

    Figure 1: Validtaion

    Environment Details

    1. OS version: Windows Server 2012
    2. Application version: 9.5 Beta 2
    3. Setup: Demo /Client: Demo
    4. Server : QA4
    5. Database: LINKSOFT-UAT95-LINKFJ and LINKSOFTNEW-95B2-LINKFJ

    Steps to reproduce failed scenarios: N/A

    Next Step: Case assigned to Sanjay for closure.

    Thanks
    Rashna


    28 Aug 201809:15AM Comment 5 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 28-08-2018 09:15 AM
    Thanks Rashna 

    09 Oct 201908:14AM Comment 6 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019