Subject: | "Time Entry maximum hours per day" configuration does not work when existing time entry hours is same as configuration value |
Summary: | The following changes are required in ESS Time: - "Time Entry maximum hours per day" configuration does not work when existing time entry hours = configuration value
- Refactor procedures so that a single entry point is used to create time entry
|
Audit Notes: | |
10 May 2018 | 09:34AM Comment 1 by Alvis (Link Technologies) Case 9286 added to project 09.4 |
14 May 2018 | 03:08PM Comment 2 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 14-05-2018 03:08 PM Time Taken: 1.00 |
| Development work for this case has been completed. The change will be available in version: 9.4 Beta 3 1. The following changes were made(Include Database object names, Program classes and any other relevant information):| - Changed procedure LT_ESS_InsertTimesheetByID and corrected issue with date format when calculating total duration.
- Verified Time entry by - Day, Time entry by week, procedures that a single entry point is used.
2. The issue was caused by: - Incorrect date format was used in date comparison.
3. Next Step - UAT
|
|
24 May 2018 | 01:40PM Comment 3 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 24-05-2018 01:40 PM Time Taken: 1.00 |
| System test completed. Verified the following: - Created entry from Timesheet import for 8th May - 8hours and marked it as submitted. A time entry for 8th May was created
- From "Time entry by day" screen, tried to create an entry for 8th May. The system gave a message "Your total duration for this day has exceeded 8.00 hours"
regards Alvis |
|
25 May 2018 | 01:44PM Comment 4 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 28-05-2018 12:00 AM Time Taken: 1.00 |
| Hi Sanjay, This case has been successfully tested. Documentation on the case has been updated under "ESS-- Administration -- Configuration". Test Environment - Version 9400 Beta 3
- Database - LINKSOFT on QA1. Demo Database
- Application on QA1
- OS - Windows
Test Plan Test | Description | Status | 1 | Create a Time Entry for "22/05/2018" a date with hours as 18. This should not be allowed.
| Pass | 2 | Create a time Entry for "22/05/2018" with hours as 8. This should be allowed.
| Pass
| 3 | Create the 2nd time Entry for "22/05/2018" with hours as 8. This should be allowed.
| Pass
| 4 | Create the 3rd time Entry for "22/05/2018 "with hours as 8. This should not be allowed.
| Pass
| 5 | Create Timesheet for "24/05/2018" with hours as 8. Submit the entry.
| Pass
| 6 | Create a time entry for "24/05/2018" with houes as 16. This should not be allowed.
| Pass
| 7 | Create a time entry for "24/05/2018" with houes as 8. This should be allowed
| Pass
| 8 | Create Timesheet for "25/05/2018" with hours as 16. Submit the entry.
| Pass
| 9 | Create a time entry for "25/05/2018" with houes as 3. This should not be allowed. | Pass
|
Thanks Rashna |
|
25 May 2018 | 02:48PM Comment 5 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 25-05-2018 02:48 PM |
| Thanks Rashna |
|
09 Oct 2019 | 08:14AM Comment 6 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019 |