Subject: | Investigate report "Shift Report (80mm Width) and standardize data |
Summary: | Investigate report "Shift Report (80mm Width) and standardize data |
Audit Notes: | Edited by sanjay on 05/03/19 09:56. Edited by alvis on 05/10/18 08:34. Edited by alvis on 05/10/18 08:32. Edited by alvis on 05/10/18 08:31. |
03 Oct 2018 | 01:49PM Comment 1 by Alvis (Link Technologies) Case 9606 added to project 10.0 |
04 Oct 2018 | 09:01AM Comment 2 by Rashna (Edge Business Solutions) Assigned To: Alvis (Link Technologies) Followup Date: 04-10-2018 09:01 AM Time Taken: 1.00 Notes: Edited by rashna on 04/10/18 09:03. |
| Hi Alvis, The "Shift Report 80mm" and "Shift Sales Report 80mm" was modified after the request by HBK. This was paid, attached is the LPO. In addition, after the reports were made standard the below clients are using it for reconciliation. - HBK
- Extra Supermarket
- Zens Medical
- Yees Cold Storage
- Shop Fitting
- Consumer Supermarket
- Miki Supermarket.
- All other medical firms and mini markets.
Business Process - Above clients have multiple cashiers with multiple shifts in a day.
- The shift is reconciled by the Supervisors.
- The cashier only holds the shift. NO shift report is printed at shift HOLD.
- The supervisor than prints the shift report from BO to reconcile.
- The above clients have only 80mm receipt printers on site.
- Example, HBK has 26 sites.
- Each shop has a POS bundle with 80mm printer.
- Reconciliation is done at each site for banking. HO only verifies the amounts submitted by the supervisors.
- Supervisors generate the "Shift Report 80mm" and "Shift Sales Report 80mm" for reconciliation.
- All receipts are printed on the 80mm printer.
Hence, we need to keep the report to maintain the current functionalities.
Thanks Rashna |
|
04 Oct 2018 | 11:12AM Comment 3 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 04-10-2018 11:12 AM Time Taken: 4.00 |
| Development work for this case has been completed. The change will be available in version: 10 Beta7 1. The following changes were made(Include Database object names, Program classes and any other relevant information):| - Renamed report from "Shift Report (80mm width)" to "Shift Close Report (80mm) - Consolidated Summary"
- Each shift's reconciliation is shown separately.
- Consolidated summary for the report is shown at the end of the shift reconciliation.
2. The issue was caused by: - Incorrect data showed when partial close is used.
3. Next Step - UAT
|
|
05 Oct 2018 | 08:35AM Comment 4 by Sanjay (Link Technologies) Assigned To: Rashna (Edge Business Solutions) Followup Date: 05-10-2018 08:35 AM Time Taken: 1.00 |
| System test completed. Updated report description which will be available on next build. Proceed with UAT. |
|
08 Oct 2018 | 02:34PM Comment 5 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 08-10-2018 02:34 PM Time Taken: 2.00 |
| Hi Sanjay QA Results Tests carried out according to requirements specified on the case header Test Results Summary Table 1 - Summarised list of issues No | Test Description | Pass/Fail | 1 | Renamed report from "Shift Report (80mm width)" to "Shift Close Report (80mm) - Consolidated Summary". | Pass | 2 | Each shift's reconciliation is shown separately. | Pass | 3 |
Consolidated summary for the report is shown at the end of the shift reconciliation. | Pass | 4 | Process transaction as per the test plan. Verify that the receipt has correct figures. | Pass |
Figure1: Test Results
Environment Details - OS version: Windows Server 2012
- Application version: 10 Beta 7
- Setup: Demo
- Server : 10.0.0.10
- Database: LINKSOFT-DEMO-10-RASHNA
Steps to reproduce failed scenarios: N/A Next Step: for documentation
|
|
09 Oct 2018 | 09:13AM Comment 6 by Rashna (Edge Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 09-10-2018 09:13 AM Time Taken: 1.00 |
| Hi Sanjay, Documentation updated on the case under BO Inventory, Purchasing -- POS Reports -- Operational -- Shift Report 80mm Consolidated Summary. Thanks Rashna |
|
09 Oct 2018 | 10:08AM Comment 7 by Sanjay (Link Technologies) Assigned To: Sanjay (Link Technologies) Followup Date: 09-10-2018 10:08 AM |
| Thanks Rashna |
|
09 Oct 2019 | 08:14AM Comment 8 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019 |