Company: Link Technologies
Case No: L08986. Project: 08.20: LinkSOFT Version 8.2
Logged By: Rashna (Edge Business Solutions) on 19 Dec 2017 03:56PM
Priority: High
Product: Point of Sale
Group: Software Defect
Time Taken: 2.00 (Weight: 2.00)
Version: 8.290.0115
Assigned To: Sanjay (Link Technologies)
Circulation: Alvis, Development, Rashna, Sanjay, Vineet
Resolve By: Wednesday, 20 December 2017 12:00 AM [2319 days since logged date]
Status: Closed
Subject: Change the posting date in JIWA to use the detail date of journals posted from LINKSOFT
Summary:    

Hi Sanjay, 

We have tested the case in QA1 with database LINKSOFTHQ. Version 8.2.3.

Steps to Replicate

  1. Create POS and JIWA Integration with JIWA 6513.
  2. Create an adjustment for item A on the 01/05/2017.
  3. Adjust 2 of item A @2.00
  4. Post the adjustment from 520-2.

When the journal is created JIWA, the detail date is 01/05/2017, however the post date is 19/12/2017. This is because the adjustment was posted on 19/12/2017 from backoffice. Refer to Figure 1 below.

Issue

  1. This journal is not validated when we run GL Valuation Process for May.
  2. Users have to manually adjust post date to post the journal

Figure 1: Journal Set



Audit Notes:
19 Dec 201703:40PM Comment 1 by Alvis (Link Technologies) Case 8986 added to project 8.2
19 Dec 201703:56PM Comment 2 by Sanjay (Link Technologies) Assigned To: Development Followup Date: 19-12-2017 03:56 PM Time Taken: 1.00
Resolved in beta4

21 Dec 201702:31PM Comment 3 by Vineet (Link Business Solutions) Assigned To: Sanjay (Link Technologies) Followup Date: 21-12-2017 02:31 PM Time Taken: 1.00
QA Results
Step 1 - Developer will perform test based on test cases provided
Step 2 - Product expert to complete Product QA based on test cases.

Test cases are provided on the case header before the case is approved for development.

Test Results Summary

Table 1 - Summarised list of issues
NoTest Description Pass/Fail 
1
 Created Adjustment on LINKSOFTHQ database on 21/12/2017 and backdated Posting date to 01/05/2017. Posted this to Jiwa and verified the Posted Date. This was 01/05/2017 
 Pass
2
 Created Adjustment on LINKSOFTBRANCH1 database on 21/12/2017 and backdated Posting date to 02/05/2017. Posted this to Jiwa ffrom HQ DB and verified Posted dated in Jiwa. This was 02/05/2017
 Pass
3
 
 
4
5
 
 

Figure 1.1 below shows a snapshot of the journal for test case 1 above.

Figure 1.1

QA Environment Details

  1. OS version: Windows 7 SP1
  2. Application version: 8.2.4.0 Beta
  3. Database (Demo/New/Client):  Demo



    09 Oct 201908:14AM Comment 4 by Sanjay (Link Technologies) Quality control status: Pass. QC Not required - This case was created before quality check was implemented in version 11 on 30/06/2019
    If you have any queries regarding this support incident, please email admin@linktechnologies.com.au and include the Case No: L08986 in the subject line of all emails regarding this issue.

    Document size: 5.0 KB
    For call complaints, please contact the Managing Director of the company using this form